News & Press

Castle Rock set to have another King Soopers

Town Council recently approved a plan for the grocery store to be built in Dawson Trails.

As the Dawson Trails community is taking shape in Castle Rock, where streets, homes and future businesses are beginning to develop, residents will likely have a King Soopers to call their own.

Following two years of planning, Castle Rock Town Council has recently approved a site improvement plan for a King Soopers to be built southwest of the Dawson Trails Boulevard and Gambel Ridge Boulevard intersection.

In addition to a 100,054-square-foot grocery store, the development will include 410 parking spaces, 15 grocery pick-up parking spaces, 20 bicycle spaces, a pharmacy with a drive-up window, a designated spot for pick-up of online orders and a 5,418-square-foot fueling station with seven fuel pumps and a kiosk.

With another King Soopers in the town, some residents wondered if this location would be replacing another. A representative from Kroger told the town council that the Dawson Trails location will be in addition to the other locations.

“We anticipate the third store will kind of alleviate pressure from the Ridge store and also Promenade,” the representative said. “No signs of closure anytime soon.”

The site was originally part of the Castle Rock Ranch Planned Development in 1986, but over the past couple of decades, the property has been rezoned twice, allowing for such a development to occur.

The Dawson Trails Planned Development is a mixed-use development with several planning areas. According to the town staff report, the proposed King Soopers is located within the east character area mainly due to the proximity to Interstate 25, the Crystal Valley Interchange and Dawson Trails Boulevard.

Aaron McLean of Galloway & Company, who was presenting to the town on behalf of King Soopers, said the grocery store is part of an overall larger development with at least 10 lots.

The report states that the type of development permitted in this location will be higher in density and include a wide range of non-residential uses such as office buildings, retail stores, restaurants, commercial and other permitted uses to provide a variety of employment and shopping.

Other tenants that are expected to be in the planning area include a restaurant, coffee shop, financial institution and a car service.

“This store and fuel station is also surrounded by other stores,” Tara Vargish, director of the development services department, said. “They all tend to balance each other out.”

King Soopers details

Through multiple neighborhood meetings, McLean said there were some revisions made to the site plan to address some concerns.

“Architectural elevations were enhanced, the access was adjusted,” McLean said, adding that the company also addressed questions about general operations and lighting. 

Standing no taller than 46 feet with full cut-off lighting, the store will be situated on the western half of the lot with the main entrance and parking oriented toward Dawson Trails Boulevard. The grocery pick-up parking and the pharmacy drive-through window will be located on the south side of the building.

Although the required parking was to be just over 500 spaces based on calculations, there will be 410 spaces provided.

According to the staff report, the town’s Municipal Code allows up to a 25% reduction in the number of required parking spaces for a commercial development, however, King Soopers requested a 19.5% reduction in the number of spaces required.

In a parking study, they cite the reduction is due to the number of short-term parking spaces for online pickup orders, with pickup hours anticipated to be between 7 a.m. and 8 p.m., home delivery of online orders from the Kroger Fulfillment Center and the drive-through pharmacy service.

As the study also cites data from the Institute of Transportation Engineers Parking Generations, it states that the proposed King Soopers seeks to align its site-specific parking requirements with current nationwide standards that reflect changing transportation patterns.

The study adds that there could also be an environmental benefit.

“Right-sizing the parking requirements for a specific use represents a step towards prompting a sustainable development which reduces the heat island effect created by a vast acreage of impervious asphalt,” the study states.

When asked if town staff thought the proposed parking was sufficient, Vargish agreed it was based on the information provided about how the store functions.

Access to the site will be from Gambel Ridge Boulevard and Dawson Trails Boulevard. A private drive and pedestrian-oriented district will also be in the planned area, which McLean said will be constructed with the initial phase of the King Soopers development.

The fueling station is expected to be accessed from a private street to the north.

Since the grocery store sits lower than the adjacent subdivision, Twin Oaks, a 50-foot-wide buffer is prescribed by the Dawson Trails Planned Development on the west side of the lot as well as increased landscaping.

With anticipated hours of operation to be similar to the Promenade King Soopers, which is 6 a.m. to 11 p.m., the Dawson Trails King Soopers is expected to be open in 2027.

As published on: https://www.castlerocknewspress.net/

Haley Lena.  

News & Press

DougCo’s all-in bid for youth sports

Douglas County is coming for kids’ travel ball, swim meet and basketball tournament weekends — plus their parents’ hotel nights, meals and everything between.

Why it matters: County-backed sports projects could turn our kid-heavy county into a regional youth sports hub.

Driving the news: County commissioners on Tuesday approved $7.5 million for the 75,000-square foot Gold Crown Field House, a $35 million project in Castle Rock’s Dawson Trails development.
  • The facility — expected to open in 2028 — would include six basketball and 12 overlapping volleyball courts.

And Colorado Aquatics Foundation launched a $3.2 million fundraising campaign for a facility at Sterling Ranch’s massive Zebulon Regional Sports Complex that’ll open in 2028.

  • It could include a 50-meter pool once used for the Olympic Trials.

The big picture: Many Douglas County parents say recreation facilities haven’t kept pace with the nationwide youth sports explosion.

Combined plans in Castle Rock, Lone Tree, Parker and Sterling Ranch project at least 10 fields, dozens of court configurations, ice sheets and pools.

Follow the money: Douglas County’s putting $7.5 million from its 0.17% parks tax into each of three projects: Gold Crown, High Note Regional Park and Salisbury Regional Park’s expansion.

  • Zebulon could use up to $100 million in Certificates of Participation.

Zoom out: Americans spend about $60 billion annually on participatory sports tourism.

  • Gold Crown Foundation officials estimate its site’s economic impact would be $14 million—$19 million per year.

What they’re saying: County Commissioner Abe Laydon called the push “the most significant parks and open space investment in county history.”

Yes, but: Opponents have raised questions about Zebulon’s financing.

The other side: County officials cite a 2024 survey showing residents prioritized recreation facilities.

Zoom in: Colorado Aquatics Foundation faces an Oct. 31 deadline to join Zebulon’s first phase or risk higher costs.

  • “It’s not hyperbolic to say that this is an opportunity of a lifetime,” foundation president Jerrod Brown tells Axios.

KT Development will design, build, program and operate Zebulon.

What’s next: Parker’s Salisbury expects to finish its first phase in September, adding four grass baseball-softball fields and two synthetic-turf multipurpose fields.

  • Lone Tree’s High Note Regional Park broke ground this year, and its first phase should open in 2027 with two lighted synthetic multipurpose fields and a 200-seat beer garden.
  • Gold Crown and Zebulon follow in 2028.

As published on: https://www.axios.com/

Get updates

Dawson Trails is growing. Sign up for community news, new home announcements, shops and restaurants, construction updates and everything else taking shape along the trail.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
  • 5 mins Downtown
    Castle Rock
  • 25 mins Denver
    Tech Center
  • 40 mins Downtown
    Denver
  • 45 mins Colorado
    Springs

Visit us

From I-25, take the Crystal Valley Parkway Exit 179. Head west to Dawson Trails Boulevard.

If you’re visiting, make an appointment with one of the homebuilders.

Get directions